Lane Closures Coming to Caledon, North of Brampton Due to Road Crack Repairs

Lane Closures Coming to Caledon, North of Brampton Due to Road Crack Repairs

Road Work Set to Begin Across Caledon: Expect Lane Closures and Possible Service Interruptions

Motorists in communities north of Brampton are being advised to prepare for traffic delays starting next week as the Town of Caledon begins an extensive road maintenance project. The scheduled work involves sealing surface cracks in roadways across several neighborhoods to prolong the life of local infrastructure.


Hot Sealant Crack Repairs Begin May 27

The roadwork is set to begin on Monday, May 27, and will run daily from 7 a.m. to 7 p.m. until all work is completed. According to the Town of Caledon, crews will be using a hot sealant to fill cracks in the pavement, a preventative maintenance method expected to extend road life by three to five years.

This type of repair reduces the potential for water infiltration, which can lead to potholes and major structural damage over time.


Communities Affected by Lane Closures

The work will impact multiple areas across Caledon, including:

  • Caledon East
  • Bolton
  • Cataract
  • Cheltenham
  • Inglewood
  • Mono Mills
  • Palgrave
  • Terra Cotta
  • Alton

Although the town has not yet provided a specific list of roads where closures will occur, residents and drivers should expect single-lane traffic in affected zones as crews perform the work.

New Luxury Marriott Hotel Coming to Ontario’s Top Summer Destination

Discover Toronto’s Most Iconic Buildings for Free This Weekend

Exploring Ontario’s Hidden Gems: The Most Charming Small Towns to Visit in Summer 2025


Traffic Management and Safety Measures

To ensure safety and minimize disruption, the Town says trained traffic control personnel will be stationed in work zones, using appropriate signage and directional instructions to guide motorists.

Drivers are urged to plan alternate routes or allow extra travel time to accommodate potential delays.


Risk of Internet and Phone Service Disruptions

In a statement, the Town of Caledon has also warned residents about a potential risk to underground communication lines. Previous projects revealed that some Bell and Rogers cables were buried closer to the surface than required, increasing the likelihood of accidental damage during roadwork.

If a communication line is severed, affected residents may experience disruptions to telephone, internet, or cable services. However, the Town emphasized that Bell and Rogers are responsible for ensuring proper cable installation depth and will be responsible for addressing any outages caused.


How to Get More Information or Report Concerns

Residents with questions or concerns about the road work can reach out to Service Caledon at:

Phone: 905-584-2272 ext. 7750

Town officials encourage residents to stay informed and to monitor the Town of Caledon website or official communication channels for real-time updates and any changes to the work schedule.


A Short-Term Disruption for Long-Term Benefit

While temporary inconveniences such as traffic delays and potential service outages may frustrate some residents, officials stress that the project is essential for maintaining safe and durable roadways throughout the region. The work is expected to improve driving conditions and help avoid larger, more costly repairs in the future.

Leave a Reply

Your email address will not be published. Required fields are marked *

You cannot copy content of this page